PUR bulk melter use steps
1) Connect the power cord of the PUR bulk
melter to a three-phase 380V power supply. Note that the rated current of the
power switch must be 32A or more, and the power cable must be 6mm2 copper wire
or more. At the same time, pay attention to the live wire, neutral wire, and
ground wire when wiring. , Do not connect it wrongly; connect the air source to
the air inlet of the air oil-water separation outside the plastic cabinet.
2) Turn on the power and air source, after
the touch screen starts to display the screen, click to enter the temperature
setting page, set the working temperature value, and then switch to the heating
page, turn on the heating function to heat the pressure plate, hose, and glue
gun to the temperature To set temperature.
3) After the temperature of the pressure
plate rises to the working temperature, click on the touch screen to switch to
the pressure plate lifting page, raise the pressure plate, put it in the rubber
bucket, and lock the bucket hoop.
4) Apply high-temperature lubricating oil
on the pressure plate sealing ring and the inner wall of the rubber barrel
inlet to facilitate the frictional lubrication between the pressure plate and
the rubber barrel.
5) Open the drain valve, press the down
button on the touch screen to lower the pressure plate, and aim at the mouth of
the rubber bucket until the pressure plate enters the rubber bucket and presses
the glue, then click the down button to keep the pressure plate in a down
state. , When the glue flows out from the emptying valve port, and after the
glue containing bubbles flows out, close the emptying valve, which means that
the air in the barrel has been exhausted.
6) Switch to the main page, click the glue
pump control button to start the glue pump to make glue